Barowka & Bonura, Engineers & Consultants, LLC.
          Contact Us  

Wastewater Collection & Treatment

Mr. Bonura served as Project Manager, Project Engineer, and/or Construction Manager for over twenty sewerage collection system projects which included over 150 sanitary sewers, force mains, and rehabilitation or new lift stations. The sanitary sewers ranged from 8-inches to 30-inches; the force mains ranged from 4-inches to 24-inches; and the lift stations ranged from less than 1 MGD to 18 MGD. During the course of the various projects, Mr. Bonura also assisted the Parish in evaluating and correcting special collection system problems throughout the Parish as they arose, such as repairing existing 78-inch prestressed concrete cylinder pipe and lining existing sanitary sewers to be used as force mains.
  • City of Baton Rouge Wastewater Treatment Plants
  • Jefferson Parish Lift Station Modeling
  • Rillieux Elementary School
  • Greater Houston Wastewater Program
  • Jefferson Parish Operation & Maintenance Management
 
Section Links
 
 

Copyright 2009,  Barowka & Bonura Engineers & Consultants, LLC  All rights reserved